National Electrification Strategy and Implementation Plan (NESIP)
Client:
Rural Electrification Agency and World Bank
Project Description:
As part of a consortium, we supported the development of Nigeria’s National Electrification Strategy and Implementation Plan (NESIP), an initiative aimed at achieving universal electricity access by 2030. For Phase 1 Vista Advisory Partners led the sub-national readiness assessment across all 36 states and the FCT. This involved collecting and analysing data on policy, infrastructure, funding & investment, capacity, and energy access to gather inputs and establish a strong evidence base for the Phase 2 and 3 of the project.
National Telecommunications Study – Ensuring the Sustainability of Nigeria’s Telecom Sector.
Client:
Federal Ministry of Communications, Innovation and Digital Economy (FMCIDE)
Project Description:
As part of a consortium, we conducted a comprehensive study on the sustainability of Nigeria’s telecommunications sector, assessing its current state and the way forward. Our analysis included an economic impact assessment of potential tariff increases, evaluating their implications on telecom operators, consumers, government revenue, and the broader economy. The study also examined the sector’s financial viability, ensuring that tariff adjustments support industry sustainability while maintaining accessibility for all income groups. We provided strategic recommendations to balance affordability with long-term industry growth, fostering a resilient and inclusive telecommunications ecosystem.
Governance Performance Reporting & Stakeholder Engagement for Rivers State’s 6-Month Emergency Administration.
Client:
Rivers state (Office of the Administrator to the President)

Project Description:
Vista Advisory Partners led the end-to-end development of a high-level Governance Performance Report for the six-month emergency administration in Rivers State, an assignment designed to document government interventions, track achievements and provide a continuity roadmap aligned with the Federal Government’s Renewed Hope Agenda.
Transaction Advisor for the Energizing Economies Initiative (EEI)
Client:
Rural Electrification Agency and World Bank
Project Description:
Acted as Transaction Advisors for the EEI, developed by the Rural Electrification Agency and sponsored by the World Bank. The initiative aimed to provide uninterrupted power supply to Micro, Small, and Medium-Scale Enterprises (MSMEs).
Business process optimization for retail gas (LPG) distribution in Lagos state. Building of profile, a 5-year business plan and business advisory
Client:
Tangram Energy
Project Description:
In collaboration with Tangram Energy, we provided vital advisory services tailored to enhance the efficiency of their retail gas (LPG) distribution operations within Lagos State. This comprehensive engagement included the development of a robust 5-year business plan, along with the meticulous refinement and seamless implementation of their operational profile. Our close partnership with Tangram's management and operations team ensured the successful execution of these updated strategies, fostering a seamless transition and operational excellence.
Technical advisors for the construction of a dedicated Independent Power Plant (Oyo State IPP)
Client:
Oyo State Government

Project Description:
Our technical advisory services were instrumental in supporting the Government of Oyo State in the realization of a dedicated Independent Power Plant (IPP). Leveraging our technical expertise, we contributed to the successful planning and execution of this critical infrastructure project.
Thorough analysis of the solar value chain in Nigeria
Client:
SEforAII , Rural Electrification Agency, All-on

Project Description:
Engaged by SEforALL, our role involved conducting a comprehensive analysis of Nigeria's solar value chain. Our mission was to design a forward-looking framework that enhances efficiencies and harnesses opportunities for localized production within the solar value chain. This strategic initiative aligns with the broader goal of accelerating progress towards Sustainable Development Goal 7 (SDG7).
Acquisition of Akute Power Limited, a 12.15MW Power Plant
Client:
Viathan Engineering Limited

Project Description:
Our advisory services played a crucial role in facilitating the acquisition of Akute Power Limited, a 12.15MW Power Plant, and the subsequent sale of Viathan Holding Company Shares to a Private Equity Firm. This collaboration with Viathan Engineering Limited supported strategic decision-making.
Financial Due Diligence on the Proposed Construction of a 42,000scmd CNG
Client:
NEO Urban Gas and Power
Project Description:
In our capacity as financial advisers, we conducted a rigorous due diligence for NEO URBAN GAS AND POWER. This involved a comprehensive assessment of a proposed USD 2,695,945 construction project for a 42,000scmd CNG facility in Ogun State, Nigeria. Our assessment provided actionable insights and a thorough financial health analysis, empowering informed decision-making for the successful project implementation. analysis, supporting informed decision-making for the successful implementation of the project.
Financial Advisers to the PPP Office on the Medipark Project
Client:
Lagos State Public Private Partnership (PPP) Office

Project Description:
We acted as financial advisers, part of a consortium, to the Lagos State PPP Office for the successful development of a proposed 120-bed space hospital in Lagos State, Nigeria. Our financial expertise and support extended throughout the project's life cycle, from the bidding process to contract sign-off, ensuring sound financial decisions and a successful public-private partnership for improved healthcare services.
Valuation of Qshop & Transaction Advisory Services on Fund Raise
Client:
QShop

Project Description:
Our team conducted a rigorous valuation exercise for QShop, coupled with transaction advisory services to support their fundraising endeavours. This comprehensive approach empowered QShop to make well-informed financial decisions, enabling their growth and successful fundraising initiatives.
Financial and Transaction Advisory Services and Valuation Exercise to Raise Private Equity up to a Tune of $3million
Client:
Solad Integrated Power Solutions

Project Description:
Serving as financial and transaction advisers to Solad Integrated Power Limited, our team conducted an extensive valuation exercise and provided critical financial advisory services. These efforts were instrumental in securing private equity funding for Solar Projects across various states in Nigeria, facilitating sustainable growth in the renewable energy sector.
Business Valuation exercise to determine the equity value of BlueDive Limited
Client:
BlueDive Limited
Project Description:
VAP executed a comprehensive business valuation exercise for BlueDive Limited, aimed at determining its equity value. This assessment provided vital insights to support strategic decision-making within the organization.
Financial advisor and arranger for Ondo State IPP
Client:
Ondo State Government

Project Description:
Our expertise came into play as we assumed the role of Financial Advisor and Arranger for the 4.5MW Ondo State Independent Power Project, coupled with the development of a dedicated 21km distribution network. Our financial guidance and arrangement services were instrumental in driving the successful implementation of this power project and distribution network in Ondo State.
Buy-Side Advisory Mandate for a West African based Financial Services conglomerate in a $17m acquisition
Client:
Safe Trust Mortgage

Project Description:
We undertook a Buy-Side Advisory Mandate for an Anglophone West African-based Financial Services conglomerate, comprising Safe Trust Mortgage (Nigeria), Capital Express (Life Insurance - Ghana), and Ping Express (US, Canada, and UK-based Fintech), in their $17 million acquisition. Our comprehensive advisory services facilitated a seamless acquisition process for these diverse financial entities.
Financial advisory on loan restructuring with AMCON
Client:
Hammerton Sage Investment Limited
Project Description:
Our financial advisory role was pivotal in facilitating the loan restructuring process for Hammerton Sage Investment Limited, an industrial fishery enterprise, during its engagement with AMCON. Our financial expertise contributed to the successful restructuring of the client's financial obligations.
Sell-Side advisory mandate in acquisition proceedings
Client:
Petra Trust
Project Description:
Provided seed capital raise support and long-term strategic advisory to Petra Trust, a leading pension fund administrator in Ghana. Through board representation for over 23 years, Vista contributed to governance oversight and strategic growth, and later supported investors in a successful sell-side exit.
Project Management and Owner’s Engineer services for six (6) Mini-Grids in Abia and River States
Client:
InfraCredit

Project Description:
Delivered comprehensive project management for six isolated solar-diesel hybrid mini-grids (521.6 kWp) in Rivers and Abia States. Reviewed construction drawings and feasibility studies, developed project schedules, monitored construction progress, managed logistics, and ensured adherence to safety and quality standards throughout implementation.
Project Management on the Development of the Blueline Independent Power Project
Client:
Lagos State Blueline Independent Power

Project Description:
Vista served as the project coordinator during the development of the independent power solution that supports Lagos’ first electric rail system. The power infrastructure was delivered and is currently operated by Blueline IPP, a Vista-related entity. This collaboration ensured end-to-end delivery from design coordination to implementation oversight, providing reliable and uninterrupted power supply to stations and electric trains.
Project Management for the construction of a 10km power distribution
Client:
Lisabi Power Plant, Viathan Engineering

Project Description:
Our role encompassed the comprehensive project management of two crucial initiatives: the construction of a 10km power distribution network and the development of a 7MW Power Plant. In close collaboration with Lisabi Power Plant and Viathan Engineering, we successfully coordinated various aspects of these projects. This involved managing a substantial workforce, integrating multiple power technologies.
Project Management for the construction of a 3.4MW Power Plant
Client:
Ilupeju Power Plant, Viathan Engineering

Project Description:
In close collaboration with Ilupeju Power Plant and Viathan Engineering, we played a pivotal role in facilitating the project management for the construction of a 3.4MW Power Plant. Our efforts ensured the seamless coordination of multiple aspects of this project, contributing to its successful realization.
Project Management for the construction of 5MWp (200K Wp Pilot) Floating Solar Farm
Client:
Floating Solar Company Limited

Project Description:
Vista served as the project lead for Nigeria’s first floating solar installation, a 5MWp plant with a 200kWp pilot phase. The project was fully integrated into Viathan’s existing distribution network through high-voltage panel connections, demonstrating the viability of incorporating distributed solar generation into traditional grid infrastructure. Vista oversaw the entire project lifecycle—from conceptual design and financial modelling to construction oversight, procurement, and regulatory compliance—delivering a pioneering renewable energy solution.
National Electrification Strategy and Implementation Plan (NESIP)
Client:
Rural Electrification Agency and World Bank
Project Description:
Vista Advisory Partners supported the Rural Electrification Agency, in partnership with the World Bank, to deliver Phase 1 of the National Electrification Strategy and Implementation Plan (NESIP) under the Electricity Act 2023. The assignment included a nationwide household energy access survey across all 774 LGAs (6,000+ households) using the World Bank Multi-Tier Framework, a comprehensive state readiness assessment, development of the national energy access dataset, detailed analytical reporting, and deployment of real-time monitoring dashboards to enable data quality assurance and evidence-based electrification planning.
Energy Audit to Assess the Feasibility of Solar Rooftop Installations for 32 General Hospitals in Lagos State
Client:
Rural Electrification Agency

Project Description:
Vista Advisory Partners conducted energy audits and solar viability assessments across 32 Primary Health Care facilities in Lagos State to evaluate existing power systems, consumption patterns, and the feasibility of rooftop solar PV for reliable healthcare delivery. The work included operational audits, load profiling, electrical mapping, power monitoring, environmental assessments, SLD development, and drone-based site analysis. Vista also built a centralized project database, real-time monitoring dashboards, and executive reporting tools to support data validation, solar sizing, facility readiness assessment, and investment planning—delivering a clear, data-driven framework for sustainable healthcare electrification.
Independent Verification Agents for Powering Healthcare Innovation Fund
Client:
SEforALL

Project Description:
Vista Advisory Partners was engaged by Sustainable Energy for All (SEforALL) to independently verify renewable energy systems installed in three healthcare facilities under the Healthcare Innovation Fund. The assignment assessed compliance with approved designs and BoQs, validated system functionality and safety, and reviewed performance indicators. Scope included technical documentation review, on-site inspection of solar PV, battery storage and auxiliary systems, verification of energy availability for critical services, and evaluation of O&M capacity. Vista also deployed structured data collection tools, geo-tagged documentation, and a centralized verification database, supported by real-time monitoring and reporting dashboards to ensure transparent compliance validation.
Solar System Verification for a Productive Use Program, Independent Verification Agents - Project Monitoring Interface
Client:
SEforALL - UEF

Project Description:
VistalQ developed a data collection application used in the verification solar systems across three milestones; data warehouse for secure storage and data visualisation dashboard to track process and report key insights.
Baseline Study and Energy Audit of 79 commercial clusters across 28 states in Nigeria
Client:
University of Massachusetts/Electricity Growth and Use in Developing Economies (eGUIDE)

Project Description:
Vista Advisory Partners supported the University of Massachusetts under the Energizing Economies (E-GUIDE) initiative to assess latent electricity demand and socio-economic activity across 79 markets in 28 Nigerian states, covering 193,384 SMEs. The project quantified unrealized electricity consumption due to unreliable grid supply and costly backup generation through shop-level energy audits conducted before and after mini-grid deployment. Vista captured detailed load estimates, energy mix, consumption patterns, expenditures, and socio-economic baseline data. The team also deployed a centralized database with real-time monitoring and executive dashboards to ensure data quality, track field performance, and enable large-scale, evidence-based analysis and reporting.
Feasibility Study for Large-Scale Data Center Site Selection in Lagos State
Client:
Microsoft

Project Description:
Our primary objective was to conduct a comprehensive feasibility study for the selection of an optimal site for a large-scale data center spanning three strategic locations within Lagos State. Our rigorous assessment encompassed critical factors including power supply reliability, accessibility, available space, and robust connectivity pathways. The ultimate aim of this study was to deliver invaluable strategic insights to inform and refine Microsoft's data center placement strategy within the region.
Baseline Study and Energy Audit of 19 Commercial Clusters Across 7 States in Nigeria
Client:
Worldbank

Project Description:
Vista Advisory Partners, in partnership with the World Bank, conducted a baseline study and energy audit across 19 commercial clusters in seven Nigerian states to assess energy use, supply reliability, costs, and productive-demand needs for scalable power interventions. The engagement included facility-level load profiling, energy source and cost analysis, and a socio-economic assessment of business activity and cluster conditions. Vista also built a centralized database with real-time monitoring and executive dashboards to ensure data quality, track field progress, and support evidence-based investment planning for sustainable power solutions.
Baseline Study and Energy Audit of 305 Communities Across Nigeria
Client:
UK Department of International Development (DFID)

Project Description:
Vista Advisory Partners was engaged by the UK Department for International Development (DFID) to conduct a nationwide baseline study and energy audit across 305 Nigerian communities, assessing electricity access, consumption patterns, supply reliability, and socio-economic conditions to inform sustainable electrification planning. The work included community-level load profiling, energy source and expenditure analysis, and socio-economic benchmarking. Vista also deployed a centralized database with real-time monitoring and executive dashboards to ensure data quality, track field performance, and support evidence-based investment prioritization at scale.
Baseline study and energy audit exercise of the industrial cluster in Abuja
Client:
Abuja Electricity Distribution Company (AEDC)

Project Description:
Vista was engaged by the Abuja Electricity Distribution Company (AEDC) to conduct a baseline study and energy audit of a prominent industrial cluster in Abuja. Our audit aimed to evaluate energy consumption patterns within this industrial hub, identify potential areas for efficiency enhancement, and support the industrial sector's energy optimization efforts.
Fossil Fuel (Diesel Genset) Study Across Lagos State
Client:
SEforALL - Energy Transition Office

Project Description:
Vista Advisory Partners was engaged by Sustainable Energy for All (SEforALL) under the Energy Transition Office to deliver a statewide Diesel Genset Study across all 20 LGAs in Lagos State. The study established baseline estimates on generator ownership, usage, grid connectivity, energy costs, and environmental and health impacts, while assessing readiness for solar alternatives. Vista designed survey instruments and a digital data collection platform, surveying 6,000 households using stratified cluster sampling and 240 MSMEs using verified enterprise listings. The team also built a centralized data warehouse with automated quality controls, real-time monitoring, and executive dashboards to visualize capacity, fuel use, cost burdens, and transition indicators—producing structured outputs to inform Lagos State’s integrated energy planning and policy decisions.
DaaS and Remote Monitoring Reading Interface
Client:
Viathan Engineering Limited

Project Description:
VAP is acting as a technical consultant and developer for Viathan to help it undergo a digital transformation from being a traditional utility to become a smart utility. This will enables the organisation leverage its vast amount of operational and customer data to drive growth through its energy-as-a -service business model. We designed the new service model identifying various data points, build cloud architecture for computing resources that supports secure data management as well as develop mobile applications for data collection and web application for cognitive user interactions.